Skip to main content

Community Extraction System Interim Operation: Six-Month Evaluation Report No. 2 (Project No. 22020-003). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group, December 1993

 Item — Box: 18, Folder: 4

Sub-Series Scope and Contents

From the Sub-Series:

This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects, including the community well test program, community extraction system, routine groundwater monitoring and site maintenance operations, and soil vapor extraction field tests.

Dates

  • Creation: December 1993

Creator

Languages

From the Collection:

The collection is in English.

Access

This collection is open for research.

Extent

From the Collection: 44.17 Linear Feet (38 boxes)

Repository Details

Part of the Manuscript Collections Repository

Contact:
University of California
Rivera Library
P.O. Box 5900
Riverside 92517-5900 USA