Box 41
Contains 141 Results:
[430] Dam construction site during flood. (Caption: 352T^6. The Panama Canal. Madden Dam Project. View looking downstream from Point 3-A at crest of flood of November 28, 1932.), 1932
This series contains photographs, negatives, and glass plate negatives regarding the Panama Canal and surrounding areas.
[431] Dam construction site during flood. (Caption: 352.T^8. The Panama Canal. Madden Dam Project. View looking south from right abutment at crest of flood of November 28, 1932.), 1932
This series contains photographs, negatives, and glass plate negatives regarding the Panama Canal and surrounding areas.
[432] Dam construction site during flood. (Caption: 352.T^11. The Panama Canal. Madden Dam Projuect. Block 12 and break in levee in receding flood. Water level about 107. Taken from gallery in Block 16. November 29th 1932.) , 1932
This series contains photographs, negatives, and glass plate negatives regarding the Panama Canal and surrounding areas.
[433] Dam construction site during flood. (Caption: 352.T^14. The Panama Canal. Madden Dam Project. Flood of November 28-29, 1932. Aggregate Loading Station. Showing 30 ft. of East end of Tramway Terminal damaged and partly washed away, and drift deposited by high water. November 29, 1932.), 1932
This series contains photographs, negatives, and glass plate negatives regarding the Panama Canal and surrounding areas.
[434] Dam construction site during flood. (Caption: 352.T^18. The Panama Canal. Madden Dam Project. General view from top of right bank at axis. Water level within levee, 103. November 30th 1932.), 1932
This series contains photographs, negatives, and glass plate negatives regarding the Panama Canal and surrounding areas.
[434 AB] Dam construction site during flood. (352.T^19. The Panama Canal. Madden Dam Project. General view downstream from Point 3-A after flood of November 28th 1932. Water level within area 103. November 30th 1932.) (2 copies) , 1932
This series contains photographs, negatives, and glass plate negatives regarding the Panama Canal and surrounding areas.
[435] Dam construction after flood. (Caption: 352.T^19 1/2. The Panama Canal. Madden Dam Project. View of trench excavated in levee to relieve pressure against cofferdam piling. December 2, 1932.) (2 copies), 1932
This series contains photographs, negatives, and glass plate negatives regarding the Panama Canal and surrounding areas.
[436] Dam construction after flood. (Caption: 352.T^20. The Panama Canal. Madden Dam Project. Close-up of break in cofferdam piling, looking East. December 2nd 1932.) (4 copies), 1932
This series contains photographs, negatives, and glass plate negatives regarding the Panama Canal and surrounding areas.
[437] View of water going over spillway. (Caption: 352.V^2. The Panama Canal. Madden Dam Project. View from Bridge showing Hydraulic Jump on Spillway Apron. All Drum Gates set at Crest El. 236.8. Reservoir El 240. Discharge 7,800 c.f.s. 2/1/33.), 1935
This series contains photographs, negatives, and glass plate negatives regarding the Panama Canal and surrounding areas.
[438] View of water going over spillway. (Caption: 352.V^13. The Panama Canal. Madden Dam Project. View from Bridge showing Hydraulic Jump on Spillway Apron. All Drum Gates fully opened. (Crest El. 232.0). Reservoir El. 239.8. Discharge 32,200 c.f.s. February 10, 1935.) (2 copies), 1935
This series contains photographs, negatives, and glass plate negatives regarding the Panama Canal and surrounding areas.