Box 42
Contains 183 Results:
[518] Close-up of break in cofferdam piling, water being pumped through pipes. (Caption: 352.T^20. The Panama Canal. Madden Dam Project. Close-up of break in cofferdam piling, looking East. December 2nd 1932.) (2 copies), 1932
This series contains photographs, negatives, and glass plate negatives regarding the Panama Canal and surrounding areas.
[519] Water inside cofferdam. (Caption: 352.T^21. The Panama Canal. Madden Dam Project. View West from levee inside cofferdam. Water at elev. 86. December 2nd, 1932.), 1932
This series contains photographs, negatives, and glass plate negatives regarding the Panama Canal and surrounding areas.
[520] View of Spillway, water, dam and people. (Caption: 352.T^22. The Panama Canal. Madden Dam Project. View of Spillway Apron Area. Vertical pump being set in foreground. Water at elev. 86. 12/2-1932.), 1932
This series contains photographs, negatives, and glass plate negatives regarding the Panama Canal and surrounding areas.
[521] View of left training wall steel, riverbank in background. (Caption: 353.T^23. The Panama Canal. Madden Dam Project. View of Left Training Wall Steel and Spillway Apron. Water at elev. 85. December 2nd 1932.)(2 copies), 1932
This series contains photographs, negatives, and glass plate negatives regarding the Panama Canal and surrounding areas.
[522] Close-up of Power house and flood debris (Caption: 353.T^24. The Panama Canal. Madden Dam Project. Close-up of Power House Area showing material deposited by flood waters entering cofferdam. Water at elev. 85. December 2nd, 1932.), 1932
This series contains photographs, negatives, and glass plate negatives regarding the Panama Canal and surrounding areas.
[523] Removing silt deposits from spillway.(Caption: 352.T^25. The Panama Canal. Madden Dam Project. Silt deposits being removed from spillway apron blocks and Power House site. December 3rd 1932.) (2 copies), 1932
This series contains photographs, negatives, and glass plate negatives regarding the Panama Canal and surrounding areas.
[524] Bonga tree debris log in road, man with machete. (Caption: 352.T^26. The Panama Canal. Madden Dam Project. Bonga tree No. 1 carried by the flood of November 28th 1932 from Clearing Area No. 3 and deposited along the road to the gravel loading terminal. 12/2-1932.) (2 copies), 1932
This series contains photographs, negatives, and glass plate negatives regarding the Panama Canal and surrounding areas.
[525] Bonga tree No. 2 log debris. (Caption: 352.T^27. The Panama Canal. Madden Dam Project. Bonga tree No. 2 carried by the flood of November 28th 1932 from Clearing Area No. 3 and deposited about 200 feet below the Gravel Loading Terminal. 12/2-32.), 1932
This series contains photographs, negatives, and glass plate negatives regarding the Panama Canal and surrounding areas.
[526] Bonga tree No. 3 log debris. (Caption: 352.T^28. The Panama Canal. Madden Dam Project. Bonga tree No. 3 carried by the flood of November 28th 1932 from Clearing Area No. 3 and deposited about 1000 feeet below the Gravel Loading Terminal.) (2 copies), 1932
This series contains photographs, negatives, and glass plate negatives regarding the Panama Canal and surrounding areas.
[527] Flood debris deposited by the side of the river. (Caption: 352.T^29. The Panama Canal. Madden Dam Project. View of debris deposited at the Gravel Loading Terminal by the flood of November 28th 1932. Photo taken from the top of the plant. December 2nd 1932.) (2 copies), 1932
This series contains photographs, negatives, and glass plate negatives regarding the Panama Canal and surrounding areas.