Box 38
Contains 13 Results:
Construction of Interim Treatment Facilities for the Stringfellow Hazardous Waste Site: Specifications and Reduced Drawings. Prepared by James M. Montgomery, Consulting Engineers, Inc. for the Santa Ana Watershed Project Authority (agent for owner: State of California Department of Health Services), October 1984
This sub-series is comprised of technical reports published in 1984 by the Santa Ana Watershed Project Authority (SAWPA). Reports pertain to the proposal, design, specifications, construction, and operation and maintenance of interim treatment facilities for the Stringfellow Hazardous Waste Site. James M. Montgomery, Consulting Engineers, Inc. and Geotechnical Consultants, Inc. were contracted by SAWPA to prepare the reports.
Draft Operation and Maintenance Manual for Interim Treatment Facilities. Prepared by James M. Montgomery, Consulting Engineers, Inc. for the Santa Ana Watershed Project Authority (agent for the State of California Department of Health Services), October 1984
This sub-series is comprised of technical reports published in 1984 by the Santa Ana Watershed Project Authority (SAWPA). Reports pertain to the proposal, design, specifications, construction, and operation and maintenance of interim treatment facilities for the Stringfellow Hazardous Waste Site. James M. Montgomery, Consulting Engineers, Inc. and Geotechnical Consultants, Inc. were contracted by SAWPA to prepare the reports.