Final Quality Assurance Project Plan for the Stringfellow Hazardous Waste Site Groundwater Monitoring Program. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program, March 1997
Item — Box: 30, Folder: 4
Sub-Series Scope and Contents
From the Sub-Series:
This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
Dates:
March 1997
Final Work Plan for the Stringfellow Hazardous Waste Site Groundwater Monitoring Program. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program, March 1997
Item — Box: 30, Folder: 4
Sub-Series Scope and Contents
From the Sub-Series:
This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
Dates:
March 1997
Final Groundwater Monitoring Report: Spring 1998: Appendix Volume 2. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program, June 1998
Item — Box: 30, Folders: 12-13
Sub-Series Scope and Contents
From the Sub-Series:
This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
Dates:
June 1998
Final Groundwater Monitoring Report: Spring 1998: Appendix Volume 4. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program, June 1998
Item — Box: 30, Folders: 14-15
Sub-Series Scope and Contents
From the Sub-Series:
This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
Dates:
June 1998
Report of the June 1998 Non-Routine Groundwater Monitoring Event. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program, July 1998
Item — Box: 30, Folder: 5
Sub-Series Scope and Contents
From the Sub-Series:
This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
Dates:
July 1998
Final Groundwater Monitoring Report: Spring 1998: Volume 1. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program, August 1998
Item — Box: 30, Folder: 1
Sub-Series Scope and Contents
From the Sub-Series:
This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
Dates:
August 1998
Final Groundwater Monitoring Report: Spring 1998: Volume 2. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program, August 1998
Item — Box: 30, Folders: 10-11
Sub-Series Scope and Contents
From the Sub-Series:
This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
Dates:
August 1998
Phase I Report: Community Extraction System Design Data Collection and Private Well Sampling: Stringfellow - Zone 4. Prepared by URS Consultants, Inc. for the Department of Toxic Substances Control, August 1996
Item — Box: 30, Folder: 3
Sub-Series Scope and Contents
From the Sub-Series:
This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
Dates:
August 1996
Stringfellow Project AOC-10 and CD Scope of Work Quarterly Report No. 7. Prepared by Bechtel Environmental, Inc. for the Pyrite Canyon Group, May 10, 1994
Item — Box: 30, Folder: 5
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
May 10, 1994
Routine Groundwater Monitoring Semi-Annual Report: Fall 1996: Volume I Report, Appendix A. Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group, September 1997
Item — Box: 30, Folder: 2
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
September 1997