Skip to main content

Box 23

 Container

Contains 26 Results:

Waste Discharge Review Interim Treatment and Disposal Program. Prepared by the State of California Health and Welfare Agency, Department of Health Services, January 1985

 Item — Box: 23, Folder: 7
Sub-Series Scope and Contents From the Sub-Series: This sub-series is comprised of technical reports published between the years 1984 and 1993 by the Toxic Substances Control Division of the California Department of Health Services (DOHS). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by DOHS and undertaken by outside consulting firms or public institutions, including Science Applications International Corporation and Kleinfelder, Inc. Reports...
Dates: January 1985

Community Well Test Program Phase I: Final Report of the Short-Term Tests: Volume 1 - Report. Prepared by S.S. Papadopulos and Associates, Inc. and Bechtel Environmental, Inc. for the Pyrite Canyon Group, June 1991

 Item — Box: 23, Folder: 10
Sub-Series Scope and Contents From the Sub-Series: This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates: June 1991

Community Well Test Program Phase I: Final Report of the Short-Term Tests: Volume 2 - Appendices A-E. Prepared by S.S. Papadopulos and Associates, Inc. and Bechtel Environmental, Inc. for the Pyrite Canyon Group, June 1991

 Item — Box: 23, Folder: 11
Sub-Series Scope and Contents From the Sub-Series: This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates: June 1991

Community Well Test Program Phase I: Final Quality Assurance/Quality Control Plan for the Permanent Facilities Installation. Prepared by Bechtel Environmental, Inc. for the Pyrite Canyon Group, March 1991

 Item — Box: 23, Folder: 10
Sub-Series Scope and Contents From the Sub-Series: This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates: March 1991

Community Well Test Program Phase I: Final Report of the Short-Term Tests: Volume 3 - Appendices F G. Prepared by S.S. Papadopulos and Associates, Inc. and Bechtel Environmental, Inc. for the Pyrite Canyon Group, June 1991

 Item — Box: 23, Folder: 12
Sub-Series Scope and Contents From the Sub-Series: This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates: June 1991

Routine Groundwater Monitoring: Final Supplement to the Project Health and Safety Plan (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group; two copies, November 1992

 Item — Box: 23, Folder: 13
Sub-Series Scope and Contents From the Sub-Series: This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates: November 1992

Routine Site Maintenance Operations: Final Supplement to the Project Health and Safety Plan. Prepared by Pyrite Canyon Group, December 1992

 Item — Box: 23, Folder: 13
Sub-Series Scope and Contents From the Sub-Series: This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates: December 1992

Zone 3 Field Investigation: Final Supplement to the Project Health and Safety Plan (Project No. 22020-002). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group, September 1993

 Item — Box: 23, Folder: 13
Sub-Series Scope and Contents From the Sub-Series: This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates: September 1993

Final Fast-Track Remedial Investigation Feasibility Study. Prepared by Ecology and Environment, Inc. (the Remedial Planning/Field Investigation Team) for the United States Environmental Protection Agency Region IX, April 9, 1984

 Item — Box: 23, Folder: 3
Sub-Series Scope and Contents From the Sub-Series: This sub-series is primarily comprised of technical reports published from 1983 to 2006 by the United States Environmental Protection Agency (US EPA), Region IX, which covers the Pacific Southwest. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site, as well as proposals for further cleanup-related efforts and activities. Some reports are publications of the federal US EPA. Two reports were prepared for separate federal agencies: the...
Dates: April 9, 1984

Final Fast-Track Remedial Investigation Feasibility Study. Prepared by Ecology and Environment, Inc. (the Remedial Planning/Field Investigation Team) for the United States Environmental Protection Agency Region IX, May 18, 1984

 Item — Box: 23, Folder: 2
Sub-Series Scope and Contents From the Sub-Series: This sub-series is primarily comprised of technical reports published from 1983 to 2006 by the United States Environmental Protection Agency (US EPA), Region IX, which covers the Pacific Southwest. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site, as well as proposals for further cleanup-related efforts and activities. Some reports are publications of the federal US EPA. Two reports were prepared for separate federal agencies: the...
Dates: May 18, 1984