Box 25
Container
Contains 20 Results:
Draft Work Plan: Stringfellow Facility Remedial Investigation/Feasibility Study: Task XXII.I: Workplan for Custodial Services. Prepared for the California Department of Health Services, Toxic Substances Control Division, Site Cleanup and Emergency Response Section, Technical Unit, by Science Applications International Corporation (JRB Associates), 1986
Item — Box: 25, Folder: 4
Sub-Series Scope and Contents
From the Sub-Series:
This sub-series is comprised of technical reports published between the years 1984 and 1993 by the Toxic Substances Control Division of the California Department of Health Services (DOHS). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by DOHS and undertaken by outside consulting firms or public institutions, including Science Applications International Corporation and Kleinfelder, Inc. Reports...
Dates:
1986
Achievement of Performance Standard Community Extraction System Element of Work. Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group, January 1995
Item — Box: 25, Folder: 1
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
January 1995
Achievement of Performance Standard Community Extraction System Element of Work. Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group, February 1996
Item — Box: 25, Folder: 2
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
February 1996
Routine Groundwater Monitoring Annual Report - Spring 1995: Volume I - Report (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group, September 1995
Item — Box: 25, Folder: 8
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
September 1995
Routine Groundwater Monitoring Biennial Report - Spring 1996: Volume I - Report. Prepared by Pyrite Canyon Group, Inc. and S.S. Papadopulos and Associates, Inc, March 1997
Item — Box: 25, Folder: 9
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
March 1997
Routine Groundwater Monitoring Biennial Report - Spring 1996: Volume II - Appendices A and B. Prepared by Pyrite Canyon Group, Inc. and S.S. Papadopulos and Associates, Inc, March 1997
Item — Box: 25, Folders: 10-11
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
March 1997
Routine Groundwater Monitoring Biennial Report - Spring 1996: Volume III - Appendix B (continued). Prepared by Pyrite Canyon Group, Inc. and S.S. Papadopulos and Associates, Inc, March 1997
Item — Box: 25, Folders: 12-14
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
March 1997
Routine Groundwater Monitoring Biennial Report - Spring 1996: Volume IV - Appendix B (continued). Prepared by Pyrite Canyon Group, Inc. and S.S. Papadopulos and Associates, Inc, March 1997
Item — Box: 25, Folders: 15-17
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
March 1997
Final Work Plan: Community Relations Support Activities by Settling Defendants for the Interim Rod Implementation at Stringfellow Superfund Site. Prepared for Settling Defendant by Pyrite Canyon Group, Inc, November 5, 1992
Item — Box: 25, Folder: 2
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
November 5, 1992
Zone 1 Dewatering System: Final Supplement to the Project Health and Safety Plan (Project No. 22020-005). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group, January 1993
Item — Multiple Containers
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
January 1993