Box 33

 Container

Contains 12 Results:

Final Semi-Annual Report: Stringfellow Hazardous Waste Site: From Period May 1, 1999 to December 31, 1999. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, January 2001

 Item — Box: 33, Folder: 11
Sub-Series Scope and Contents From the Sub-Series: This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
Dates: January 2001

Final Annual Report: Stringfellow Hazardous Waste Site: From Period January 1, 2000 to December 31, 2000. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, November 2001

 Item — Box: 33, Folders: 12-13
Sub-Series Scope and Contents From the Sub-Series: This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
Dates: November 2001

Final Groundwater Monitoring Report: Spring 2000: Appendix Volume 1. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program, July 2000

 Item — Box: 33, Folders: 1-3
Sub-Series Scope and Contents From the Sub-Series: This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
Dates: July 2000

Final Groundwater Monitoring Report: Spring 2000: Appendix Volume 2. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program, July 2000

 Item — Box: 33, Folders: 4-6
Sub-Series Scope and Contents From the Sub-Series: This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
Dates: July 2000

Non-Routine Groundwater Monitoring Report: August 2001. Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch, January 2002

 Item — Box: 33, Folders: 14-15
Sub-Series Scope and Contents From the Sub-Series: This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
Dates: January 2002

Non-Routine Groundwater Monitoring Report: September 2001. Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch, January 2002

 Item — Box: 33, Folder: 16
Sub-Series Scope and Contents From the Sub-Series: This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
Dates: January 2002

Non-Routine Groundwater Monitoring Report: June 2002. Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch, August 2002

 Item — Box: 33, Folder: 9
Sub-Series Scope and Contents From the Sub-Series: This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
Dates: August 2002

Draft Supplemental Feasibility Study: Volume 1: Report. Prepared by ENVIRON Corporation for the Department of Toxic Substances Control, April 21, 2000

 Item — Multiple Containers
Sub-Series Scope and Contents From the Sub-Series: This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
Dates: April 21, 2000

Cone Penetrometer Testing and Well/Piezometer Installation Work Plan. Prepared by GeoLogic Associates in association with Bryan A. Stirrat and Associates for the California Department of Toxic Substances Control, Stringfellow Branch, September 2001

 Item — Box: 33, Folder: 8
Sub-Series Scope and Contents From the Sub-Series: This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
Dates: September 2001

Step-Drawdown and Long-Term Pumping Tests: Zone 3 Monitoring Wells. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, March 2000

 Item — Box: 33, Folder: 10
Sub-Series Scope and Contents From the Sub-Series: This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
Dates: March 2000