Skip to main content

Box 27

 Container

Contains 12 Results:

Community Well Test Program Phase I: Monthly Report No. 27 (three copies). Prepared by Bechtel Environmental, Inc. for the Pyrite Canyon Group, November 10, 1992

 Item — Box: 27, Folder: 10
Sub-Series Scope and Contents From the Sub-Series: This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates: November 10, 1992

Soil Vapor Extraction Field Test: Final Supplement to the Project Health and Safety Plan (Project No. 22020-001). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group. (two copies), May 1993

 Item — Multiple Containers
Sub-Series Scope and Contents From the Sub-Series: This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates: May 1993