Box 28
     Container 
  
Contains 12 Results:
Final Groundwater Monitoring Report: Fall 1997: Appendix A Volume 2. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation, December 1997
     Item  — Box: 28, Folders: 1-4
  
      Sub-Series Scope and Contents
        From the Sub-Series:
        This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
    
    
        Dates: 
      December 1997
    
  
    
  
Final Groundwater Monitoring Report: Fall 1997: Appendix A Volume 3. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation, December 1997
     Item  — Box: 28, Folders: 5-6
  
      Sub-Series Scope and Contents
        From the Sub-Series:
        This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
    
    
        Dates: 
      December 1997
    
  
    
  
Final Groundwater Monitoring Report: Spring 1998: Appendix Volume 1. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program, June 1998
     Item  — Box: 28, Folders: 7-8
  
      Sub-Series Scope and Contents
        From the Sub-Series:
        This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
    
    
        Dates: 
      June 1998
    
  
    
  
Final Groundwater Monitoring Report: Spring 1998: Appendix Volume 3. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program, June 1998
     Item  — Box: 28, Folders: 9-11
  
      Sub-Series Scope and Contents
        From the Sub-Series:
        This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
    
    
        Dates: 
      June 1998
    
  
    
  
"Air Quality Analysis: Stringfellow Site: PTP Effluent Pipeline Project." Prepared by JHA Environmental Consultants, LLC for the Department of Toxic Substances Control, October 28, 1997
     Item  — Box: 28, Folder: 15
  
      Sub-Series Scope and Contents
        From the Sub-Series:
        This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
    
    
        Dates: 
      October 28, 1997
    
  
    
  
"Response to Comments: Proposed Negative Declaration and Initial Study for Stringfellow PTP Effluent Pipeline Project." Prepared by the Department of Toxic Substances Control, December 22, 1997
     Item  — Box: 28, Folder: 15
  
      Sub-Series Scope and Contents
        From the Sub-Series:
        This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
    
    
        Dates: 
      December 22, 1997
    
  
    
  
Stringfellow - Zone 1: Extraction Well and Piezometer Installation and Testing, Riverside, California. Prepared by URS Greiner, Inc. - California for the Department of Toxic Substances Control, March 1998
     Item  — Box: 28, Folders: 12-14
  
      Sub-Series Scope and Contents
        From the Sub-Series:
        This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
    
    
        Dates: 
      March 1998
    
  
    
  
Work Plan for Further Work in Zone 4. Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group, August 1997
     Item  — Box: 28, Folder: 17
  
      Sub-Series Scope and Contents
        From the Sub-Series:
        This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
    
    
        Dates: 
      August 1997
    
  
    
  
Measurement of Performance Standard Bedrock Hydraulic Control Component (affiliated with Zone 1 Dewatering System Element of Work). Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group, January 1995
     Item  — Box: 28, Folder: 16
  
      Sub-Series Scope and Contents
        From the Sub-Series:
        This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
    
    
        Dates: 
      January 1995
    
  
    
  
Measurement of Performance Standard Upgradient Interception Component (affiliated with Zone 1 Dewatering System Element of Work). Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group, January 1995
     Item  — Box: 28, Folder: 16
  
      Sub-Series Scope and Contents
        From the Sub-Series:
        This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
    
    
        Dates: 
      January 1995