Box 28
     Container 
  
Contains 12 Results:
Achievement of Performance Standard Bedrock Hydraulic Control Component (affiliated with Zone 1 Dewatering System Element of Work). Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group, July 1997
     Item  — Box: 28, Folder: 16
  
      Sub-Series Scope and Contents
        From the Sub-Series:
        This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
    
    
        Dates: 
      July 1997
    
  
    
  
Achievement of Performance Standard Upgradient Interception Component (affiliated with Zone 1 Dewatering System Element of Work). Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group, July 1997
     Item  — Box: 28, Folder: 17
  
      Sub-Series Scope and Contents
        From the Sub-Series:
        This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
    
    
        Dates: 
      July 1997