Final Groundwater Monitoring Report: Spring 1999: Appendix Volume 2. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program, June 1999

 Item — Box: 32, Folders: 6-7
Sub-Series Scope and Contents From the Sub-Series: This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
Dates: June 1999

Final Groundwater Monitoring Report: Spring 1999: Volume 2. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program, July 1999

 Item — Box: 32, Folders: 4-5
Sub-Series Scope and Contents From the Sub-Series: This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
Dates: July 1999

Final Groundwater Monitoring Report: Fall 1999. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program, February 2000

 Item — Box: 32, Folder: 8
Sub-Series Scope and Contents From the Sub-Series: This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
Dates: February 2000

Final Groundwater Monitoring Report: Spring 2000 Volume 1. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program, July 2000

 Item — Box: 32, Folder: 9
Sub-Series Scope and Contents From the Sub-Series: This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
Dates: July 2000

Final Groundwater Monitoring Report: Spring 2000 Volume 2. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, Site Mitigation Program, July 2000

 Item — Box: 32, Folders: 10-11
Sub-Series Scope and Contents From the Sub-Series: This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
Dates: July 2000

Zone 3 Deep Soil Gas Survey Report. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, June 7, 1999

 Item — Box: 32, Folder: 3
Sub-Series Scope and Contents From the Sub-Series: This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
Dates: June 7, 1999

Final Clay Barrier Testing - Pumping Test Work Plan. Prepared by Tetra Tech, Inc. for the Department of Toxic Substances Control, May 3, 2000

 Item — Box: 32, Folder: 18
Sub-Series Scope and Contents From the Sub-Series: This sub-series is comprised of technical reports published between the years 1996 and 2009 by the California Environmental Protection Agency's Department of Toxic Substances Control (DTSC). Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site; summative annual reports are also included. Projects were often contracted by the DTSC and undertaken by outside consulting firms, including ENVIRON Corporation, GeoLogic Associates, Shaw...
Dates: May 3, 2000

Community Extraction System Interim Operation: Six-Month Evaluation Report No. 12. Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group, March 1999

 Item — Box: 32, Folder: 16
Sub-Series Scope and Contents From the Sub-Series: This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates: March 1999

Zone 1 Dewatering System Six-Month Evaluation Report No. 10 (Further Work in Zone 4): Volume II: Appendix D. Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group, April 1999

 Item — Box: 32, Folders: 1-2
Sub-Series Scope and Contents From the Sub-Series: This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates: April 1999

Zone 1 Dewatering System Six-Month Evaluation Report No. 8. Prepared by S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group, December 1998

 Item — Box: 32, Folders: 12-13
Sub-Series Scope and Contents From the Sub-Series: This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates: December 1998