Box 17
Container
Contains 11 Results:
Final Routine Site Maintenance Operations Plan. Prepared by Pyrite Canyon Group, December 1992
Item — Box: 17, Folder: 2
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
December 1992
Final Soil Vapor Extraction Field Test Design Report (Project No. 22020-001). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group, February 1993
Item — Box: 17, Folder: 5
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
February 1993
Final Soil Vapor Extraction Field Test Plan (Project No. 22020-001). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group, February 1993
Item — Box: 17, Folder: 6
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
February 1993
Final Soil Vapor Extraction Field Test Evaluation Report: Volume 1 Report (Project No. 22020-001). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group, November 1994
Item — Box: 17, Folders: 7-8
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
November 1994
Final Soil Vapor Extraction Field Test Evaluation Report: Volume 2 Appendices (Project No. 22020-001). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group, November 1994
Item — Box: 17, Folders: 9-10
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
November 1994
Final Soil Vapor Extraction Field Test Evaluation Report: Volume 3 Appendices (Project No. 22020-001). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group, November 1994
Item — Box: 17, Folders: 11-13
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
November 1994
Final Soil Vapor Extraction Field Test Evaluation Report: Volume 4 Appendices (Project No. 22020-001). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group, November 1994
Item — Box: 17, Folders: 14-15
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
November 1994
Final Project Health and Safety Plan (Project No. 22020). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group, May 1993
Item — Box: 17, Folders: 3-4
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
May 1993
Final Zone 3 Field Investigation Plan (Project No. 22020-002). Prepared by S.S. Papadopulos and Associates, Inc. and Bechtel Environmental, Inc. for Pyrite Canyon Group, September 1993
Item — Box: 17, Folder: 16
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
September 1993
Final Water Management Report (Project No. 22020-002). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group, August 1994
Item — Multiple Containers
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
August 1994