Skip to main content

California. Water Project Authority

 Item — Box: 25, Item: 122

Scope and Contents

Progress report on study of disposal of electric power generated at Shasta Dam Power Plant. Sacramento 1953.

Presented to the Interim Committee on Water Problems, California Legislature at a hearing held in San Francisco, Calif., February 18-20, 1953.

Dates

  • Creation: Majority of material found within 1930-1968

Creator

Languages

From the Collection:

The collection is in English.

Access

The collection is open for research.

Extent

From the Collection: 19 Linear Feet (40 boxes)

Physical Description

1 v. (various pagings) illus., tables

Repository Details

Part of the Water Resources Collections & Archives Repository

Contact:
University of California
Rivera Library
P.O. Box 5900
Riverside CA 92517-5900 United States