Skip to main content

Koretsky, S.

 Item — Box: 28, Item: 135d

Scope and Contents

Specifications for the construction of preload tanks and circular structures. Revised November 15, 1949.

Bound with: draft copy of Instructions for inspection and test-wire winding of sludge digestion concrete tanks, (4/2/51); and various memos, minutes of meetings, handdrawn graphs of W.R. McLean and others, March 1951.

Bound in: E.B.M.U.D. Distribution Division; special reports.

Dates

  • Creation: Majority of material found within 1930-1968

Creator

Languages

From the Collection:

The collection is in English.

Access

The collection is open for research.

Extent

From the Collection: 19 Linear Feet (40 boxes)

Physical Description

(mimeo) tables

Repository Details

Part of the Water Resources Collections & Archives Repository

Contact:
University of California
Rivera Library
P.O. Box 5900
Riverside CA 92517-5900 United States