Skip to main content

Box 1

 Container

Contains 34 Results:

De Ferrari, Carlo M

 Item — Box: 1, Item: 1
Scope and Contents

History of the Clavey family and the Clavey River. 198-?.

Dates: 1978-1995; Majority of material found within 1991-1994

Agreement between Modesto Irrigation District, Turlock Irrigation District, and Tuolumne County regarding hydroelectric generating and water storage facilities to be located in Tuolumne County, California, 1984

 Item — Box: 1, Item: 2
Collection Scope and Contents From the Collection:

The collection consists of correspondence, speeches, essays, articles, reports, printed matter, clippings, photographs, maps, artwork, etc. Compiled chiefly by Wally Anker, President of the Clavey River Preservation Coalition, as a result of the Coalition's and others' opposition to the Clavey River Project, a dam and hydroelectric power plant to be built on the Clavey River in Tuolumne County, California by the Turlock Irrigation District.

Dates: 1984

Robertson, Stephen Richard, 1985

 Item — Box: 1, Item: 3
Scope and Contents

Clavey River wild trout habitat management plan. Sonora, Calif. : Stanislaus National Forest

Dates: 1985

Clavey River water and power development planning work agreement between Turlock Irrigation District and Tuolumne County, 1986

 Item — Box: 1, Item: 4
Collection Scope and Contents From the Collection:

The collection consists of correspondence, speeches, essays, articles, reports, printed matter, clippings, photographs, maps, artwork, etc. Compiled chiefly by Wally Anker, President of the Clavey River Preservation Coalition, as a result of the Coalition's and others' opposition to the Clavey River Project, a dam and hydroelectric power plant to be built on the Clavey River in Tuolumne County, California by the Turlock Irrigation District.

Dates: 1986

A "rattle-snake infested, inaccessible, ____ing place.", circa 1986

 Item — Box: 1, Item: 5
Scope and Contents

IN: Pertschuk, Michael, Giant killers. New York : Norton, c1986.

Dates: circa 1986

Faulstich, Leo, 1988

 Item — Box: 1, Item: 6
Scope and Contents

Memorandum to Tuolumne County Board of Supervisors : re: questions regarding water rates

Dates: 1988

Appellants' request for immediate Commission action and notice of intent to treat further inaction as a final denial and to seek judicial review, 1988

 Item — Box: 1, Item: 7
Collection Scope and Contents From the Collection:

The collection consists of correspondence, speeches, essays, articles, reports, printed matter, clippings, photographs, maps, artwork, etc. Compiled chiefly by Wally Anker, President of the Clavey River Preservation Coalition, as a result of the Coalition's and others' opposition to the Clavey River Project, a dam and hydroelectric power plant to be built on the Clavey River in Tuolumne County, California by the Turlock Irrigation District.

Dates: 1988

Tuolumne River Preservation Trust, 1988

 Item — Box: 1, Item: 8
Scope and Contents

Proposal to protect the Clavey wild trout stream through a "least-cost" conservation analysis

Dates: 1988

Sierra Club. Tuolumne Group, 1989

 Item — Box: 1, Item: 9
Scope and Contents

Position paper : Clavey River Project. Sonora, CA (P.O. Box 4440, Sonora 95370) : The Group

Dates: 1989

Tuolumne County (Calif.). Board of Supervisors, 1989

 Item — Box: 1, Item: 10
Scope and Contents

Resolution of the Board of Supervisors of the County of Tuolumne regarding participation in the Clavey River Project

Dates: 1989