Box 85
Container
Contains 447 Results:
Santa Ysabel River from a point 500 feet above upper dam site at Pamo. Support under south end of stream gaging cable shown. (W.P. Rowe), June 20, 1922
Item — Box: 85
Identifier: 3281
Series Scope and Contents
From the Series:
The photographs in this series are pasted in albums with Lippincott’s handwritten numbers and captions. When this collection was first processed in 1999, processing staff transcribed photograph titles directly from these handwritten captions. The photo album titles were also transcribed from Lippincott’s own titles.Several photograph titles reference outdated geographic names that include racial slurs. UCR Library has chosen to keep and add context to Lippincott’s use of harmful...
Dates:
June 20, 1922
Phoenix, Arizona
Item — Box: 85
Identifier: 3282_3289
Series Scope and Contents
From the Series:
The photographs in this series are pasted in albums with Lippincott’s handwritten numbers and captions. When this collection was first processed in 1999, processing staff transcribed photograph titles directly from these handwritten captions. The photo album titles were also transcribed from Lippincott’s own titles.Several photograph titles reference outdated geographic names that include racial slurs. UCR Library has chosen to keep and add context to Lippincott’s use of harmful...
Dates:
1908-1929
Henshaw Dam, July 29, 1922
Item — Box: 85
Identifier: 3290_3293
Series Scope and Contents
From the Series:
The photographs in this series are pasted in albums with Lippincott’s handwritten numbers and captions. When this collection was first processed in 1999, processing staff transcribed photograph titles directly from these handwritten captions. The photo album titles were also transcribed from Lippincott’s own titles.Several photograph titles reference outdated geographic names that include racial slurs. UCR Library has chosen to keep and add context to Lippincott’s use of harmful...
Dates:
July 29, 1922
Don Pedro Dam
Item — Box: 85
Identifier: 3294_3299
Series Scope and Contents
From the Series:
The photographs in this series are pasted in albums with Lippincott’s handwritten numbers and captions. When this collection was first processed in 1999, processing staff transcribed photograph titles directly from these handwritten captions. The photo album titles were also transcribed from Lippincott’s own titles.Several photograph titles reference outdated geographic names that include racial slurs. UCR Library has chosen to keep and add context to Lippincott’s use of harmful...
Dates:
1908-1929
General view - note single stationary high line. Supt. says two or more towers much better. Note aggregate storage bins in rear, also mixer house in upper left corner. Aggregate hauled from deposit by railroad and to mixers by electric locomotive. Cement handled in sacks. Mass concrete mix, 1-3-6-3 requiring 0.825 bbl. per c.y. avg. all con. about 1 bbl., however. Mixers 2-2 c.y., 8 hour avg., now 1200 c.y. Total concrete to place 281,000 c.y. excl. spillway and power house, August 26, 1922
Item — Box: 85
Identifier: 3294
Series Scope and Contents
From the Series:
The photographs in this series are pasted in albums with Lippincott’s handwritten numbers and captions. When this collection was first processed in 1999, processing staff transcribed photograph titles directly from these handwritten captions. The photo album titles were also transcribed from Lippincott’s own titles.Several photograph titles reference outdated geographic names that include racial slurs. UCR Library has chosen to keep and add context to Lippincott’s use of harmful...
Dates:
August 26, 1922
Concrete deposit method - concrete hauled in cars by elec. locomotive on steel trestle carried on completed section to dump hopper where it is timbered for unequal water content at mixers. Chutes slope 4 in. 12 relined every 40,000 yds. Trestle now being carried forward for next rise, August 26, 1922
Item — Box: 85
Identifier: 3295
Series Scope and Contents
From the Series:
The photographs in this series are pasted in albums with Lippincott’s handwritten numbers and captions. When this collection was first processed in 1999, processing staff transcribed photograph titles directly from these handwritten captions. The photo album titles were also transcribed from Lippincott’s own titles.Several photograph titles reference outdated geographic names that include racial slurs. UCR Library has chosen to keep and add context to Lippincott’s use of harmful...
Dates:
August 26, 1922
Construction plant - aggregate storage bins in rear. Tunnel under trestle and pile with traps for loading cars hauling to mixer. Note single stationary high line tower and steel tower for carrying chute support cables, August 26, 1922
Item — Box: 85
Identifier: 3296
Series Scope and Contents
From the Series:
The photographs in this series are pasted in albums with Lippincott’s handwritten numbers and captions. When this collection was first processed in 1999, processing staff transcribed photograph titles directly from these handwritten captions. The photo album titles were also transcribed from Lippincott’s own titles.Several photograph titles reference outdated geographic names that include racial slurs. UCR Library has chosen to keep and add context to Lippincott’s use of harmful...
Dates:
August 26, 1922
General view of concreting system - dam carried up in four foot lifts but superintendent says five would be better. Forms are 4×8 wood fabricated at saw mill and used from 12 to 18 times. Forms supported by 2 - #9 wires, 2'8" cts. Construction steps 50' long. Note construction joints and inspection galleries, also copper seal at upstream face along construction joint, August 26, 1922
Item — Box: 85
Identifier: 3297
Series Scope and Contents
From the Series:
The photographs in this series are pasted in albums with Lippincott’s handwritten numbers and captions. When this collection was first processed in 1999, processing staff transcribed photograph titles directly from these handwritten captions. The photo album titles were also transcribed from Lippincott’s own titles.Several photograph titles reference outdated geographic names that include racial slurs. UCR Library has chosen to keep and add context to Lippincott’s use of harmful...
Dates:
August 26, 1922
Showing construction trestle, chutes and north abutment, August 26, 1922
Item — Box: 85
Identifier: 3298
Series Scope and Contents
From the Series:
The photographs in this series are pasted in albums with Lippincott’s handwritten numbers and captions. When this collection was first processed in 1999, processing staff transcribed photograph titles directly from these handwritten captions. The photo album titles were also transcribed from Lippincott’s own titles.Several photograph titles reference outdated geographic names that include racial slurs. UCR Library has chosen to keep and add context to Lippincott’s use of harmful...
Dates:
August 26, 1922
View from end - steel construction trestle and gate being set on second step down. Drainage through 8" concrete pipe. Note long key being cast on upstream side at top each lift, August 26, 1922
Item — Box: 85
Identifier: 3299
Series Scope and Contents
From the Series:
The photographs in this series are pasted in albums with Lippincott’s handwritten numbers and captions. When this collection was first processed in 1999, processing staff transcribed photograph titles directly from these handwritten captions. The photo album titles were also transcribed from Lippincott’s own titles.Several photograph titles reference outdated geographic names that include racial slurs. UCR Library has chosen to keep and add context to Lippincott’s use of harmful...
Dates:
August 26, 1922