Box 5
Contains 11 Results:
Selected drawings of Briones Dam, March 11, 1966
Various drawings prepared by EBMUD and Kaiser Engineers.
Baugh, M.O.
Calibration of P-22 Nuclear Chicago Surface Density Probe. Orinda, Calif., East Bay Municipal Utility District, Special Projects Construction Division, Orinda Laboratory, 1963.
Briones Project Sepc. 860-I.
Frost, Daniel J.
Geology of the Briones Dam, L-M axis site, Contra Costa County, California. Oakland, Calif., Kaiser Engineers, 1960.
Prepared for East Bay Municipal Utility District.
Baugh, M.O.
Briones Project -- outlet tower foundation, load bearing test. East Bay Municipal Utility District, Special Projects Construction Division, 1961.
Miscellaneous material relating to Briones Project (Spec. 860) stilling basin slide, June 1961. 1961-1964
Includes various letters and memos, diaries, photo index, drawings.
Baugh, M.O.
Construction of test embankment for materials proposed for use in Zone III section of Briones Dam including laboratory and field tests. Orinda, Calif., East Bay Municipal Utility District, Special Projects Construction Division, Orinda Laboratory, 1963.
Briones Project Spec. 860-I.
Spencer, R.A.
Laboratory report on tests of undisturbed Borrow Area II ext., material sampled from Zone III embankment, Briones Dam, Spec. 860. 1964.
Briones Dam; review of embankment and foundation areas, February 1963
EBMUD Specification no. 860.
Wright, R.S.
Briones Project, Spec. 860 -- Payment limits, spillway area excavation. 1964.
Submitted to Hugo Hanson, Resident Engineer.
Baugh, M.O.
Appendix to Feature Report Briones Dam, Specification no. 860. 1964.
Memo to Hugh Hanson, Resident Engineer, on items: A. Concrete items; B. Reinforcing steel; and C. Fabrication.