Box 2
Contains 21 Results:
Napa River Flood Management Plan, 1996
Preliminary analysis of a geomorphically-based channel design prepared for the U.S. Army Corps of Engineers, Sacramento Districtby Philip Williams & Associates(Vincent Neary, Philip B. Williams, Peter Goodwin, Aaron Mead,and Joan Florsheim), September 24, 1996.
Conceptual plan for enhancement of the alluvial floodplains and tidal marshlands of the Upper Napa River Estuary, 1997
Prepared for the California State Coastal Conservancyand Napa County Flood Control and Water Conservation Districtby Philip Williams & Associates(Vincent Neary, Philip B. Williams, Scott Wright,and Jennifer Fox) and Woodward Clyde & Associates(Francesca Demgen), December 1997.
Pilarcitos Creek Restoration Demonstration Project, undated
Project plan for removing the fish migration barrier on Mills Creek.Prepared for Regional Water Quality Control Boardand California Dept. of Fish and Gameby Steve Zembsch, Watershed Science,and William Vandivere, Clearwater Hydrology.Kondolf's note: "This plan lacks its maps and figures, so it's not enough to review on its own. Review along with another proposal."
Pine Creek Tungstar Meandering Channel Project, 1987
Design plan for a proposed diversion of minewater discharge flows from the Stratcor tungsten mine (FERC permit no. 7267). Located adjacent to Morgan and upper Pine Creek in Inyo County. Prepared by Thomas R. Payne and Associates,Arcata, CA, June 10, 1987.
San Joaquin River basin hydrograph component analysis : technical memorandum, 2001
Prepared for Natural Heritage Institute ; repared by McBain and Trush, Arcata, CA, December 12, 2001.
Sausal Creek Restoration Project, 2000
Removal of three structures currently located within the active channel of Sausal Creek in Dimond Park, providing opportunity for comprehensive hydrological, habitat, and native plant restoration. Prepared for City of Oakland Public Works Agencyand Alameda County Public Works Agencyby Wolfe Mason Associates, Inc.,Oakland, CA, in coordination with Waterways Restoration Institute,Berkeley, CA, May 2000.
Upper Scott Creek Enhancement and Stabilization Project, 1996
Fishery project grant proposal to stabilize four areas of eroding bank with redwood and rock wing deflector groins and log crib slough walls, etc. Contractor: County of Santa Cruz, Zone 4 Flood Control and Water Conservation District.
Lower Scott Creek Enhancement and Stabilization Project, 1996
Fishery project grant proposal to enhance rearing, escapement, and spawning habitat through the placement of large wood structures and the placement of log and boulder combination structures. Contractor: County of Santa Cruz, Zone 4 Flood Control and Water Conservation District.
Scott Creek Habitat Enhancement Program, 1998
Memorandum to Michael Bird,Inland Fisheries Division, from Kris Vyverberg,Engineering Geologist, California Dept. of Fish and Game,May 7, 1998. Contains Vyverberg's comments and recommendations for the proposed project.
Application for U.S. Army Corps of Engineerspermit (404) for the Scott Creek Enhancement Project, 1998?
Applicant: County of Santa Cruz, Zone 4 Flood Control and Water Conservation District.