Skip to main content

Box 4

 Container

Contains 10 Results:

Plan for ecological retoration of the McCarran Ranch reach of the Truckee River: review draft, 2003

 File — Box: 4, Folder: TRU-2
Scope and Contents

Prepared for the Nature Conservancy ; prepared by Otis Bay Environmental Consultants, February 25, 2003.

Dates: 2003

Uvas Creek Preserve Creek Restoration Plan, 1993

 File — Box: 4, Folder: UVA-1
Scope and Contents

Project plan presented to the Habitat Restoration Groupand Beals Landscape Architectsfor the City of Gilroy;prepared by Steve Zembsch, Watershed Science,Aromas, CA.

Dates: 1993

U.S. Army Corps of Engineers, San Francisco Districtpublic notice, 1994 November 16

 File — Box: 4, Folder: UVA-2
Collection Scope and Contents From the Collection:

The collection consists of river restoration project plans for various sites in California. Compiled by Prof. G. Mathias Kondolf for his Landscape Architecture and Environmental Planning (LA227) course, "Restoration of Rivers and Streams," University of California, Berkeley. Several of the plans were prepared for the CALFED Bay-Delta Program.

Dates: 1994 November 16

Department of the Army permit, 1995 April 13

 File — Box: 4, Folder: UVA-3
Scope and Contents

Permit no. 19613S92, issued to the City of Gilroy by the U.S. Army Corps of Engineers, San Francisco District,authorizing Uvas Creek restoration project.

Dates: 1995 April 13

Stream Restoration Plan for Wildcat Creek, 1992

 File — Box: 4, Folder: WIL-1
Scope and Contents

Project plan for restoration of a reach of Wildcat Creek in Alvarado Park near San Pablo, CA. Prepared for East Bay Regional Parks Districtby David L. Rosgen, Wildland Hydrology Consultants,Pagosa Springs, CO, June 10, 1992.

Dates: 1992

Habitat mitigation and monitoring proposal, 1993

 File — Box: 4, Folder: WIL-2
Scope and Contents

Proposal submitted to U.S. Army Corps of Engineerson Wildcat Creek restoration. Prepared by David L. Rosgen, Wildland Hydrology Consultants,and Michael Lamb, East Bay Regional Parks District,January 27, 1993.

Dates: 1993

Hydrologic and geomorphic assessment of the Wildcat Creek Restoration Project, 1997

 File — Box: 4, Folder: WIL-3
Scope and Contents

Assessment of localized project instability following floods in the winters of 1995 and 1997 and proposal of modifications for project maintenance and repair. Prepared for East Bay Regional Parks Districtby William Vandivere, Clearwater Hydrology,San Francisco, CA, June 10, 1997.

Dates: 1997

Tuolumne River Channel Restoration Project, 1998

 File — Box: 4, Folder: TUO-1
Scope and Contents

Project plan for Gasburg Creekfine sediment detention basin, Tuolumne River Mile 50.4. Prepared for Tuolumne River Technical Advisory Committee(Don Pedro Project, FERC License no. 2299) by McBain and Trush,Arcata, CA, March 12, 1998.

Dates: 1998

Tuolumne River Fine Sediment Management, 2000

 File — Box: 4, Folder: TUO-2
Scope and Contents

Proposal prepared for CALFED Bay-Delta Programby Turlock Irrigation District,for project located on Tuolumne River in the vicinity of the town of La Grange, Stanislaus County.

Dates: 2000

Tuolumne River Channel Restoration Project, 1997

 File — Box: 4, Folder: TUO-3
Scope and Contents

Project proposal for special run pools 9 and 10, Tuolumne River Mile 25.9 and 25.4. Prepared for Tuolumne River Technical Advisory Committee(Don Pedro Project, FERC License no. 2299) by McBain and Trush,Arcata, CA, and EA Engineering, Science, & Technology,Lafayette, CA, July 15, 1997.

Dates: 1997