Skip to main content

Construction of Interim Treatment Facilities for the Stringfellow Hazardous Waste Site: Specifications and Reduced Drawings. Prepared by James M. Montgomery, Consulting Engineers, Inc. for the Santa Ana Watershed Project Authority (agent for owner: State of California Department of Health Services), October 1984

 Item — Box: 38, Folder: 5

Sub-Series Scope and Contents

From the Sub-Series:

This sub-series is comprised of technical reports published in 1984 by the Santa Ana Watershed Project Authority (SAWPA). Reports pertain to the proposal, design, specifications, construction, and operation and maintenance of interim treatment facilities for the Stringfellow Hazardous Waste Site. James M. Montgomery, Consulting Engineers, Inc. and Geotechnical Consultants, Inc. were contracted by SAWPA to prepare the reports.

Dates

  • Creation: October 1984

Creator

Languages

From the Collection:

The collection is in English.

Access

This collection is open for research.

Extent

From the Collection: 44.17 Linear Feet (38 boxes)

Repository Details

Part of the Manuscript Collections Repository

Contact:
University of California
Rivera Library
P.O. Box 5900
Riverside 92517-5900 USA