Box 38
Contains 13 Results:
Stringfellow 2001 Annual Report. Prepared by Tetra Tech, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch, December 2004
Stringfellow 2002 Annual Report. Prepared by Tetra Tech, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch, December 2004
Stringfellow 2003 Annual Report. Prepared by Tetra Tech, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch, March 2006
"Stringfellow 2003 Annual Report" (CD). Prepared by Tetra Tech, Inc, March 2006
Final Bench-Scale Testing Summary Report for Sequential Biological Treatment of Groundwater (Volume 2 of 2). Prepared by Shaw Environmental, Inc. for the California Department of Toxic Substances Control, Stringfellow Branch, December 2004
Zone 4 Subsurface Investigation. Prepared by GeoLogic Associates for the California Department of Toxic Substances Control, Stringfellow Branch, February 2003
Pyrite Canyon Group Community Well Test Program Phase I. Prepared by Bechtel National, Inc. for Pyrite Canyon Group, May 1991
Draft Report: Pilot Testing of Mid-Canyon Interceptor Well Field (two copies). Prepared by Ecology and Environment, Inc. (CH2M Hill) for the United States Environmental Protection Agency, August 10, 1984
Final Draft Predesign Report for Interim Treatment Facilities. Prepared by James M. Montgomery, Consulting Engineers, Inc. for the Santa Ana Watershed Project Authority, September 1984
This sub-series is comprised of technical reports published in 1984 by the Santa Ana Watershed Project Authority (SAWPA). Reports pertain to the proposal, design, specifications, construction, and operation and maintenance of interim treatment facilities for the Stringfellow Hazardous Waste Site. James M. Montgomery, Consulting Engineers, Inc. and Geotechnical Consultants, Inc. were contracted by SAWPA to prepare the reports.
Specifications for Furnishing Equipment for Interim Treatment Facilities (procurement documents). Prepared by James M. Montgomery, Consulting Engineers, Inc. for the Santa Ana Watershed Project Authority (agent for the State of California Department of Health Services), September 1984
This sub-series is comprised of technical reports published in 1984 by the Santa Ana Watershed Project Authority (SAWPA). Reports pertain to the proposal, design, specifications, construction, and operation and maintenance of interim treatment facilities for the Stringfellow Hazardous Waste Site. James M. Montgomery, Consulting Engineers, Inc. and Geotechnical Consultants, Inc. were contracted by SAWPA to prepare the reports.