Box 18
Container
Contains 11 Results:
Community Extraction System Final Interim Operation Plan (Project No. 22020-003). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group, November 1992
Item — Box: 18, Folder: 2
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
November 1992
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 1 (Project No. 22020-003). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group, June 1993
Item — Box: 18, Folder: 3
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
June 1993
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 2 (Project No. 22020-003). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group, December 1993
Item — Box: 18, Folder: 4
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
December 1993
Community Extraction System Interim Operation: Six-Month Evaluation Report No. 3 (Project No. 22020-003). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group, June 1994
Item — Box: 18, Folder: 5
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
June 1994
Final Routine Groundwater Monitoring Plan (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. for Pyrite Canyon Group, November 1992
Item — Box: 18, Folders: 6-7
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
November 1992
Routine Groundwater Monitoring Annual Report - Spring 1993: Volume 2 Appendices (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group, June 1993
Item — Box: 18, Folders: 8-9
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
June 1993
Routine Groundwater Monitoring Annual Report - Spring 1993: Volume 3 Appendices (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group, June 1993
Item — Box: 18, Folders: 10-12
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
June 1993
Routine Groundwater Monitoring Semi-Annual Report - Fall 1993: Volume 1 Report (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group, December 1993
Item — Box: 18, Folder: 13
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
December 1993
Routine Groundwater Monitoring Semi-Annual Report - Fall 1993: Volume 2 Appendices (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group, December 1993
Item — Box: 18, Folders: 14-16
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
December 1993
Routine Groundwater Monitoring Semi-Annual Report - Fall 1993: Volume 3 Appendices (Project No. 22020-004). Prepared by Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. for Pyrite Canyon Group, December 1993
Item — Box: 18, Folders: 17-18
Sub-Series Scope and Contents
From the Sub-Series:
This series is comprised of technical reports published from 1991 to about 2000 by Pyrite Canyon Group, a private corporation located in the city of Riverside. Reports document the results of various field studies conducted at the Stringfellow Hazardous Waste Site. Projects were often contracted by Pyrite Canyon Group and undertaken by outside consulting firms, including Bechtel Environmental, Inc. and S.S. Papadopulos and Associates, Inc. Reports pertain to multiple topics and projects,...
Dates:
December 1993